Location

  1. HOME
  2. About NRA
  3. NRA Regional Offices
  4. Tsuruga NRA Regional Office

Tsuruga NRA Regional Office

Facilities to be inspected

  • • Tsuruga Power Station, Japan Atomic Power Co., Inc.
  • • Fast Breeder Reactor Monju, Japan Atomic Energy Agency
  • • Fugen Decommissioning Engineering Center, Japan Atomic Energy Agency

Tsuruga Power Station, Japan Atomic Power Co., Inc.

Tsuruga Power Station

Power Generation Facilities

Unit 1

Reactor Type
BWR
Capacity
357 MWe
Commissioning
March 14, 1970

Unit 2

Reactor Type
PWR
Capacity
1160 MWe
Commissioning
February 17, 1987

Present States of Operation

Fast Breeder Reactor Monju, Japan Atomic Energy Agency

Power Generation Facilities

Reactor Type
FBR
Capacity
280 MWe
Commissioning
(First Criticality for Trial Operation, April 5, 1994)

Present States of Operation

Fugen Decommissioning Engineering Center, Japan Atomic Energy Agency

Power Generation Facilities

Reactor Type
ATR
Capacity
165 MWe
Commissioning
March 20, 1979 (Termination of Operation, March 29 2003)

Present States of Operation

Location of the Nuclear Facilities

Tsuruga-shi, Fukui Prefecture

Address

Fukui Prefecture Tsuruga Nuclear Emergency Preparedness Center 1F,
99-11-47 Kanayama, Tsuruga-shi, Fukui, 914-0146

Phone: 0770-25-8661

Fax: 0770-25-8662

History

  • •Tsuruga NRA Regional Office was established in September, 2012.
Back to Top