fontsize

  • Larger
  • Normal
  • Largest

Kashiwazaki-Kariwa NRA Regional Office

Facilities to be inspected

  • • Kashiwazaki-Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc.

Kashiwazaki-Kariwa Nuclear Power Station

Power Generation Facilities

List
Unit No. Reactor Type Capacity Commissioning
Unit 1 BWR 1100 MWe September 18, 1985
Unit 2 BWR 1100 MWe September 28, 1990
Unit 3 BWR 1100 MWe August 11, 1993
Unit 4 BWR 1100 MWe August 11, 1994
Unit 5 BWR 1100 MWe April 10, 1990
Unit 6 ABWR 1356 MWe November 7, 1996
Unit 7 ABWR 1356 MWe July 2, 1997

Present States of Operation

Unit 1
Suspended (Periodic Inspection)
Unit 2
Suspended (Periodic Inspection)
Unit 3
Suspended (Periodic Inspection)
Unit 4
Suspended (Periodic Inspection)
Unit 5
Suspended (Periodic Inspection)
Unit 6
Suspended (Periodic Inspection)
Unit 7
Suspended (Periodic Inspection)

Location of the Nuclear Facilities

Kariwa-mura, Kariwa-gun and Kashiwazaki-shi, Niigata Prefecture

Return to top of page

Address

Niigata Prefecture Nuclear Emergency Preparedness Center 1F,
5-48 Sanwa-cho, Kashiwazaki-shi, Niigata, #945-0034

Phone: 0257-23-9798

Fax: 0257-23-8632

Return to top of page

Off-site Center

Niigata Prefecture Nuclear Emergency Preparedness Center

[Address] 5-48 Sanwa-cho, Kashiwazaki-shi, Niigata, #945-0034

Map of NRA Regional Office

Return to top of page

Personnel

  • • General Manager, Head of Nuclear Safety Inspectors (Nuclear Emergency Preparedness Senior Officer / concurrently assigned)
  • • Deputy General Manager, Nuclear Emergency Preparedness Senior Officer (Nuclear Safety Inspector / concurrently assigned)
  • • Seven Nuclear Safety Inspectors

Nine members in total

Return to top of page

History

  • • Kashiwazaki-Kariwa NRA Regional Office was established in September, 2012.

Return to top of page

Back to Home